Ready for your next journey? Book your ticket with KAI.

Book Now!
KAI Logo
KAI President Director Oversees Dynamic Trial of Eighth INKA KRL Trainset, Ensures Commuter Line Service Readiness

KAI President Director Oversees Dynamic Trial of Eighth INKA KRL Trainset, Ensures Commuter Line Service Readiness

6 November 2026
by Administrator

Amid high mobility among the people of Greater Jakarta, PT Kereta Api Indonesia (Persero) is preparing to improve the quality of its Commuter Line services. Since Wednesday night (November 4), KAI, together with PT Industri Kereta Api (Persero), or INKA, has been conducting dynamic trials of the eighth domestically manufactured KRL trainset on the Bogor–Jakarta Kota route.

KAI President Director Bobby Rasyidin pays close attention to every stage of KAI Group's service development, including rolling stock readiness, safety, and operational reliability.

“Every day, millions of people rely on KAI Group services for their daily activities. Our responsibility is to ensure that their journeys are safe, comfortable, and continuously improving. Therefore, every process involved in preparing the rolling stock is carried out carefully,” Bobby said.

Bobby added that KAI is preparing to procure 23 new trainsets, which are targeted for completion within 2 to 3 years, with 8 of them urgently needed as soon as possible. The entire procurement process has been entrusted to INKA, which has the flexibility to manufacture the rolling stock independently or cooperate with overseas manufacturers, provided that domestic industries remain involved.

“We place our full trust in INKA to carry out the procurement of these 23 trainsets. INKA has the flexibility to determine its production scheme, whether through independent manufacturing or partnerships with international parties, with the requirement that it must cooperate with and involve domestic industries,” Bobby explained.

Throughout January–October 2026, Commuter Line Jabodetabek served 303,792,024 customers, with an average of 999,316 customers per day. This significant travel demand serves as a reference for management in maintaining service continuity and rolling stock readiness.

KAI Vice President of Corporate Communication Anne Purba explained that the dynamic trial of the eighth INKA KRL trainset is being conducted outside peak hours to evaluate technical and safety readiness.

Previously, seven INKA-manufactured trainsets had undergone comprehensive inspections and resumed serving customers in October 2026.

“We continue to oversee the testing process together with KAI Commuter and INKA. Every stage is an important part of ensuring that the rolling stock is ready to serve the public safely and reliably,” Anne concluded.

VP Corporate Communication KAI

Share to:

We use cookies

This site uses cookies for analytics and to improve your experience. You can accept or decline non-essential cookies. Learn about our Privacy Policy.